Overview
A short film commissioned by Spa Communications to be shot on location at University College Dublin to capture the story and case study of the re-architecture data centre and upgrade of the cooling systems at the university using Schneider Electric and Total Power Solutions infrastructure and technologies.
Objective
To film and produce a video that is succinct with an approximate duration of 70s in length, requiring views of the data centre and its location with some detailed shots and using VO rather than an interview piece to camera.


